Track Laying
Laid the first track in the area that will eventually be a tunnel and hidden staging yard. Glued down the roadbed material and then glued the track to the roadbed. Installed a tortoise for the main yard turnout using hot glue gun. Had to mount the tortoise off to the side since I didnt want the switch machines hanging from the bottom of the module. See the photo below for details.
![](//photos1.blogger.com/blogger/4363/2048/200/TunnelTrackage.jpg)
Tunnel Trackage
![](//photos1.blogger.com/blogger/4363/2048/200/WestStaging.jpg)
West Staging Throat
![](//photos1.blogger.com/blogger/4363/2048/200/TortoiseInstall.jpg)
Tortoise Install
![](http://photos1.blogger.com/blogger/4363/2048/200/TunnelTrackage.jpg)
Tunnel Trackage
![](http://photos1.blogger.com/blogger/4363/2048/200/WestStaging.jpg)
West Staging Throat
![](http://photos1.blogger.com/blogger/4363/2048/200/TortoiseInstall.jpg)
Tortoise Install
Comments